USS Ohio SSGN conversion |
|
Career (US) | |
---|---|
Namesake: | U.S. state of Ohio |
Ordered: | 1 July 1974 |
Builder: | General Dynamics Electric Boat |
Laid down: | 10 April 1976 |
Launched: | 7 April 1979 |
Commissioned: | 11 November 1981 |
Homeport: | Bangor, Washington |
Motto: | Always first |
Nickname: | First and Finest! |
Status: | in active service, as of 2012[update] |
Badge: | |
General characteristics | |
Class and type: | Ohio class SSGN |
Displacement: | 16,764 metric tons (16,499 long tons) surfaced[1][2] 18,750 metric tons (18,450 long tons) submerged[1] |
Length: | 560 ft (170 m)[1] |
Beam: | 42 ft (13 m)[1] |
Propulsion: | 1x S8G PWR nuclear reactor[1] 2x geared turbines[1] 1x 325 hp (242 kW) auxiliary motor 1 shaft @ 60,000 shp (45 MW)[1] |
Speed: | 12 knots (14 mph; 22 km/h) surfaced[1] +20 knots (23 mph; 37 km/h) submerged (official)[1] 25 knots (29 mph; 46 km/h) submerged (reported)[1] |
Range: | unlimited except by food supplies |
Test depth: | +800 ft (240 m) |
Crew: | 15 officers[1][2] 140 enlisted[1][2] |
Sensors and processing systems: |
BQQ-6 Bow mounted sonar[1] BQR-19 Navigation[1] BQS-13 Active sonar[1] TB-16 towed array[1] |
Armament: |
4 × 21 inches (530 mm) bow torpedo tubes. SSGN conversion22 tubes, each with 7 Tomahawk cruise missiles. |
USS Ohio (SSBN-726/SSGN-726), the lead ship of her class of nuclear-powered fleet ballistic missile submarines, was the fourth ship of the United States Navy to be named for the 17th state. She was commissioned with the hull designation of SSBN-726, and with her conversion to a guided missile submarine she was re-designated SSGN-726.
Contents |
The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 1 July 1974 and her keel was laid down on 10 April 1976 by Mrs. Robert Taft, wife of Senator Taft. On 2 February 1978, the Precommissioning Unit was formed with Commander A. K. Thompson as its Commanding Officer. Ohio was launched on 7 April 1979 sponsored by Mrs. Annie Glenn, wife of Senator John H. Glenn.
In the summer of 1981, sea trials were held to test the equipment and systems, and the submarine was delivered to the U.S. Navy on 28 October 1981. On 11 November 1981, Ohio was commissioned. The principal speaker, Vice President George H. W. Bush, remarked to the 8000 assembled guests that the ship introduced a "new dimension in our nation's strategic deterrence," and Admiral Hyman G. Rickover noted that the Ohio should "strike fear in the hearts of our enemies." On that day, command of the two crews (designated Blue and Gold) of the USS Ohio was assumed by Captain A. K. Thompson (Blue) and Captain A. F. Campbell (Gold).
Following Post Shakedown Availability at Electric Boat Division, Ohio left the Atlantic and transited to her new home port, Bangor, Washington, by way of Cape Canaveral - where she tested her missile launch systems - and the Panama Canal, arriving on 12 August 1982. During August and September 1982, the first loadout of Trident C-4 missiles and a predeployment refit were conducted. Ohio and her Blue Crew departed on the first Trident Submarine Strategic Deterrent Patrol in October 1982.
From June 1993 to June 1994 Ohio underwent overhaul at Puget Sound Naval Shipyard, Bremerton, Washington, receiving extensive upgrades to sonar, fire control, and navigation systems. Ohio resumed strategic deterrent patrols in January 1995 as part of Submarine Squadron Seventeen, Submarine Group Nine, Pacific Submarine Force.
Original plans called for Ohio to be retired in 2002. Instead, Ohio and three sister ships were modified and remain in service as conventional missile submarines (SSGNs). (See the discussion of the entire Ohio class for details.) In November 2003 Ohio entered drydock, beginning a 36-month refueling and conversion overhaul. Electric Boat announced on 9 January 2006 that the conversion had been completed. Ohio rejoined the fleet on 7 February 2006. Ballistic submarines of Ohio's class employ two crews, Blue and Gold, in order to facilitate continuous operation at sea, called "forward-presence" in USN parlance.[3] On 21 January 2007, the Gold Crew departed Naval Base Kitsap for Hawaii to conduct a forward-deployed crew exchange, the first such forward-deployed swap in approximately 20 years.[4]
The Ohio left for her first mission on 15 October 2007. The Blue crew underwent several tests and inspections before completing a mission sometime in December. The Ohio is also the first one of the class to complete a mission.
This article includes information collected from the Naval Vessel Register.
|